Overhead Cranes PlaybookNow

In large construction and fabrication spaces, overhead/bridge cranes do the heavy lifting—literally. This field-tested breakdown follows the journey from bare runways to a commissioned crane ready for service. We’ll cover structural checks, safety, and QA/QC—with the same checklists pro installers use.

Bridge Crane Basics

At heart, a bridge crane is a bridge beam that spans between two runway beams, carrying a trolley-mounted hoist for precise, vertical picks. The system delivers three axes of motion: and lift via the hoist.

You’ll find them in fabrication bays, steel plants, power stations, oil & gas shops, precast yards, and logistics hubs.

Why they matter:

Safe handling of very heavy, unwieldy loads.

Huge efficiency gains.

Repeatable, precise positioning that reduces damage.

Support for pipelines, structural steel, and big home contractors near me machinery installs.

Scope at a Glance

Runways & rails: runway girders with crane rail and clips.

End trucks: motorized gearboxes for long-travel.

Bridge girder(s): single- or double-girder configuration.

Trolley & hoist: reeving, hook block, upper limit switches.

Electrics & controls: power supply, festoon or conductor bars.

Stops, bumpers & safety: end stops, buffers, travel limits.

Depending on capacity and span, the crane might be a single-girder 10-ton unit or a massive double-girder 100-ton system. The installation flow stays similar, with heavier rigs demanding extra controls and sign-offs.

Before the First Bolt

A clean install is mostly planning. Key steps:

Drawings & submittals: Approve general arrangement (GA), electrical schematics, and loads to the structure.

Permits/JSAs: Job Safety Analysis (JSA) for each lift step.

Runway verification: Survey columns and runway beams for straightness, elevation, and span.

Power readiness: Lockout/tagout plan for energization.

Staging & laydown: Lay out slings, shackles, spreader bars, and chokers per rigging plan.

People & roles: Appoint a lift director, rigger, signaler, and electrical lead.

Tiny survey errors balloon into hours of rework. Measure twice, lift once.

Getting the Path Right

Runway alignment is the foundation. Targets and checks:

Straightness & elevation: shim packs under clips to meet tolerance.

Gauge (span) & squareness: Check centerlines at intervals; confirm end squareness and expansion joints.

End stops & buffers: Verify clearances for bumpers at both ends.

Conductor system: Keep dropper spacing uniform; ensure collector shoe reach.

Log final numbers on the ITP sheet. Misalignment shows up as crab angle and hot gearboxes—don’t accept it.

Putting the Span in the Air

Rigging plan: Softeners protect painted flanges. Dedicated signaler on radio.

Sequence:

Lift end trucks to runway level and set temporarily on blocks.

Rig the bridge girder(s) and make the main lift.

Land the bridge on the end trucks and pin/bolt per GA.

Measure diagonal distances to confirm squareness.

Before anyone celebrates, bump-test long-travel motors with temporary power (under permit): confirm limit switch wiring. Re-apply LOTO once checks pass.

Hoist & Trolley

Trolley installation: Mount wheels, align wheel flanges, set side-clearances.

Hoist reeving: Lubricate wire rope; verify dead-end terminations.

Limits & load devices: Check overload/SLI and emergency stop.

Cross-travel adjustment: Verify end stops and bumpers.

Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.

A smooth trolley with a quiet hoist is a sign of good alignment. Fix the mechanics first.

Drive Tuning & Interlocks

Power supply: Conductor bars with collectors or a festoon system.

Drive setup: Enable S-curve profiles for precise positioning.

Interlocks & safety: Zone limits near doors or mezzanines.

Cable management: Secure junction boxes; label everything for maintenance.

Commissioning crews love clean labeling and clear folders. If it isn’t documented, it didn’t happen—put it in the databook.

ITP, Checklists, and Sign-Off

Inspection Test Plan (ITP): Third-party witness for critical steps.

Torque logs: Re-check after 24 hours if required.

Level & gauge reports: Attach survey prints.

Motor rotation & phasing: Confirm brake lift timing.

Functional tests: Jog commands, inching speeds, limits, overloads, pendant/remote range.

QA/QC is not paperwork—it’s your warranty in a binder.

Load Testing & Commissioning

Static load test: Hold at mid-span and near end stops; monitor deflection and brake performance.

Dynamic load test: Travel long-run, cross-travel, and hoist at rated speed with test load.

Operational checks: Emergency stop shuts down all motions.

Training & handover: Maintenance intervals for rope, brakes, and gearboxes.

When the logbook is clean, the crane is officially in service.

Everyday Heavy Lifting

Construction & steel erection: handling long members safely.

Oil & gas & power: generator and turbine assembly.

Steel mills & foundries: hot metal handling (with the right duty class).

Warehousing & logistics: bulk material moves with minimal floor traffic.

Floor stays clear, production keeps flowing, and precision goes up.

Do It Safe or Don’t Do It

Rigging discipline: rated slings & shackles, correct angles, spreader bars for load geometry.

Lockout/Tagout: clear isolation points for electrical work.

Fall protection & edges: scissor lifts and manlifts inspected.

Runway integrity: no cracked welds, correct bolt grades, proper grout.

Duty class selection: overspec when uncertainty exists.

A perfect lift is the one nobody notices because nothing went wrong.

Troubleshooting & Pro Tips

Crab angle/drift: verify end-truck wheel diameters and gearbox mounts.

Hot gearboxes: adjust brake air gap and reduce VFD decel.

Rope drum spooling: dress rope and reset lower limit.

Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.

Wheel wear & rail pitting: add rail sweeps and check clip torque.

A 10-minute weekly check saves days of downtime later.

Quick Answers

Overhead vs. gantry? Choose per site constraints.

Single vs. double girder? Span and duty class usually decide.

How long does install take? Anything from a couple weeks to a few months.

What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.

Why Watch/Read This

Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll gain a checklist mindset that keeps cranes safe and productive.

Want ready-to-use checklists for runway surveys, torque logs, and load-test plans?

Get the toolkit now so your next crane goes in cleaner, faster, and right the first time. Save it to your site tablet for quick reference.

...